slider image slider_item_cHwqqh

Product Development Process

We offer stock pack for cost-effective, ready-made shapes with personalized finishes and quick turnaround, and custom pack for tailor-made solutions featuring unique designs and finishes to elevate your brand identity.

One-Stop Packaging Manufacturer
XY Tech Packaging aims to provide customers with one-stop packaging manufacturer,
Contains products design, material selection, mold design & development,injection
& blow molding,glass & metal production,metallization, spraying, HIS, printing, and assembly.

Most manufacturers handle only one Step Of the process, requiring you to coordinate with multiple companies. For example, to produce a simple plastic jar, you'd need to find an injection blow molding company, another for finishing and decoration, and yet another for additional components like metal parts. This process can be time-consuming and complicated.We simplify it by offering comprehensive manufacturing services under one roof. Trusted by the world's biggest brands, we deliver high-quality solutions with better cost efficiency, faster turnaround, and stricter quality control. We work exclusively with brands that prioritize quality, ensuring exceptional results every time.

01

Initial Discussions

Discuss the minimum order quantity for stock and provide Tiered pricing, arrange for sample delivery; Brand positioning: Offer the most cost-effective proposals base on customer’s decoration requirements; Delivery time/quality: Understand the sampling process, product delivery lead time, and quality requirements; Price: Costs of sampling and mass products, services, payment terms, and return conditions; Services: Conduct factory inspection, provide support for after-sales services such as product shelf life.

02

Sample Arrangement

Based on customer requirements, build the sampling plan, and arrange sampling. Verify decoration specifications, printing positions, and other details, and provide a specific time for sample completion.

03

Sample Confirmation

After confirming the sample effect, arrange it to be transferred to the production management center. (If the effect does not meet expectations, a second sampling can be arranged until satisfaction.)

04

Placing the Order

Based on the customer confirmed sample, a purchase order is issued, and both parties complete the contract signing and payment processes. An exact delivery date is provided in response.

05

Mass Production

Mass production begins. The general process includes:moulding (injection moulding, bi-injection moulding, injection blow moulding, extrusion blow moulding) painting/coating, printing, and assembly, including in-process inspections and warehouse inspections for incoming and outgoing materials.

06

Delivery

Payment as per contract, arranging for customer's on-site inspection or sample inspection, then shipment. (Partial disinfection services available upon request).

01

Early-stage Communication

  • Quantity Required: Determine the number of mould cavities to evaluate the optimalsolution;
  • Brand Positioning: To provide the most cost-effective solution; Delivery Time/Qualitthe product delivery time and quality standard requirements;
  • Price: Costs of moulds, prototypes, and products, including services payment terms, return conditions;
  • Services: Pre-sales services such as factory inspection, signing of confidentiality agreements, customization of drawings, and prototype models; Support for after-sale services such as product shelf life.

02

Project Establishment

According to customer requirements, customize the project, evaluate the best solution and timeliness.

03

Product Design and Confirmation

According to customer requirements, provide product design drawings and communicate details until satisfactory confirmation is achieved.

04

Customized Mold Production

After confirming the product design, complete the relevant contract. Proceed with mold design and initiate the customization of the mold.

05

Mold Trial Sampling

Complete the mold making and sample production according to the schedule; conduct decoration on sample based on the customer's decoration specifications, provide samples, and iterate until confirmation.

06

Place Production Order

Based on the customer-confirmed sample, quality control limit range requirements will be produced. Upon receipt of a purchase order from the customer, both parties will complete the contract signing and payment processes. An exact delivery date will be provided. Mass production will commence, typically following the process of moulding (injection moulding, bi-injection moulding, injection blow moulding, extrusion blow moulding) painting/coating, printing, and assembly, including in-process inspections and warehouse inspections for incoming and outgoing materials.

07

Delivery

Payment will be made according to the contract requirements, and arrangements will be made for either on-site inspection by the customer at the factory or sample inspection before shipping. (Partial disinfection services are available upon request.)